2 bathrooms (showers) and a large kitchen that will eventually need backsplash. There will also be some stone tiles on the front and rear patios.

Do you do the float concrete on the shower walls? hot mop is already finished



2012-06-16 10.02.58

2012-06-16 10.04.43


This bath needs wainscoting and grout. the tub enclosure and floor are already tiled but my current tile guy has a full time job/ school and cant complete the job in the required timeframe.

2012-06-16 10.05.03




I will need backsplash for the kitchen after granite installation in a couple weeks there is about 41 ft of countertop between the office and the kitchen:
Bill 2


I will also have some stone tile work on the front and rear patios 56 sq ft and 228 sq ft:


As with most projects now, we are way over budget and cost is a big issue. please let me know how you charge.